THE BUILDING OF THE SCHOOLSHIP FOR THE MARITIME ACADEMY OF HARLINGEN
The Maritime Academy of Harlingen (Netherlands) and the Faculty of I.M.S.T. from Drobeta Turnu Severin (Romania) began a collaborationship since 2004, when the workshop QUalifications Agreement Within The European Educational Process Of NAVigation(QUEENAV) took place in Drobeta Turnu Severin, September 23-25, 2004.
One of the results of this relatioship is represented by this project. It consists in „processing” of the Maritime Academy of Harlingen schoolship by taking picture by the Romanian students from the Inland Navigation Dept. of the Faculty of I.M.S.T. This schoolship is built by the SEVERNAV Shipyard from Drobeta Turnu Severin. The Romanian students will take relevant photos of each stage of the building process. Thus, picture by picture, the schoolship will be „electronically” built. Finally, the Dutch and the Romanian students will be able to see, in real time, the final shape of the Maritime Academy of Harlingen schoolship.
No. |
Picture Link |
Date |
RO |
UK |
301 | IMAG_292 |
May, 11, 2006 |
Sfarsit ... Botezul navei-scoala „Printesa Maxima si Printesa Amalia” |
The end ... The „Princess Maxima and Princess Amalia” schoolship baptising |
300 | IMAG_291 | |||
299 | IMAG_290 | |||
298 | IMAG_289 | 03/30/2006 | Vedere a impingatorului din prova babord. |
View of the pusher from the port prow. |
297 | IMAG_288 | 03/30/2006 | Vedere a impingatorului din prova tribord. |
View of the pusher from the star prow. |
296 | IMAG_287 | 03/30/2006 |
Vedere a barjei din prova tribord. Se vopseste inainte de lansare. |
View of the barge from the star prow. It is painting before the launching. |
295 | IMAG_286 | 03/30/2006 |
Puntea barjei. |
The deck of the barge. |
294 | IMAG_285 | 03/30/2006 |
Impingatorul vazut de sus. |
The pusher seen from above. |
293 | IMAG_284 | 03/30/2006 | Puntea pupa a barjei. |
The aft deck of the barge. |
292 | IMAG_283 | 03/30/2006 |
Puntea barjei. |
The deck of the barge. |
291 | IMAG_282 | 03/30/2006 |
Barja , vedere pe babord in pupa. |
The barge, view on the port side in the aft zone. |
290 | IMAG_281 | 03/30/2006 | Barja , vedere pe babord in pupa | The barge, view on the port side in the aft zone. |
289 | IMAG_280 | 03/30/2006 | Barja , vedere pe babord in pupa. |
The barge, view on the port side in the aft zone. |
288 | IMAG_279 | 03/30/2006 | Barja , vedere pe babord. |
The barge, view on the port side. |
287 | IMAG_278 | 03/30/2006 | Vedere a impingatorului din pupa babord. |
The view of the pusher from the aft on the port side. |
286 | IMAG_277 | 03/30/2006 | Pupa impingatorului (bloc sectia nr.2), asteptind extremitatea pupa (bloc sectia nr.1) |
The aft of the pusher (the block section no.2), waiting for the extremity of the aft (block section no.1). |
285 | IMAG_276 | 03/30/2006 | Numele barjei. | The name of the barge. |
284 | IMAG_275 | 03/30/2006 | Vedere a barjei din prova babord. Se vopseste inainte de lansare. | View of the barge from the port prow. It is painted before the launching. |
283 | IMAG_274 | 03/30/2006 | Vedere a barjei din prova tribord. Se vopseste inainte de lansare. | View of the barge from the star prow. It is painting before the launching. |
282 | IMAG_273 | 03/03/2006 | Pupa de la impingator fara blocsectia nr. 1 (blocsectia pupa). | The aft from the pusher without the block section no. 1 ( the block section of the aft ). |
281 | IMAG_272 | 03/03/2006 | Puntea pupa de la impingator. | The aft deck of the pusher. |
280 | IMAG_271 | 03/03/2006 | Sub fundul barjei in pupa. | Under the bottom of the barge in the aft. |
279 | IMAG_270 | 03/03/2006 | Puntea pupa de la barja. | The aft deck from the barge. |
278 | IMAG_269 | 03/03/2006 | Interiorul rufului pupa de la barja. | Inside of the aft roof from the barge. |
277 | IMAG_268 | 03/03/2006 | Interiorul magaziei de marfa de la barja. | Inside of the goods hold from the barge. |
276 | IMAG_267 | 03/03/2006 | Puntea barjei spre pupa. Se vad cele doua tambuchiuri ale magaziilor de marfa si ruful pupa. | The deck of the barge to the aft side. You can see those two hatches of the goods holds and the roof from the aft. |
275 | IMAG_266 | 03/03/2006 | Puntea barjei spre prova. Se vad ruful prova si tambuchiul magaziei prova. | The deck of the barge to the bow side. There are the roof of the bow and the hatch of the first goods hold |
274 | IMAG_265 | 03/02/2006 | Barja, vedere generala. | The barge, general view. |
273 | IMAG_264 | 03/02/2006 | Impingatorul, vedere generala. | The pusher, general view |
272 | IMAG_263 | 03/02/2006 | Interiorul bloc sectiei nr. 1 de la impingator, osatura structurii. | The inside of the block section no. 1 from the pusher, the framework of the structure. |
271 | IMAG_262 | 03/02/2006 | Interiorul bloc sectiei nr. 1 de la impingator, osatura structurii. | The inside of the block section no. 1 from the pusher, the frame work of the structure. |
270 | IMAG_261 | 03/02/2006 | Bloc sectia nr. 1 de la impingator, vedere din prova. | The block section no. 1 from the pusher, view from the bow side. |
269 | IMAG_260 | 03/02/2006 | Bloc sectia nr. 1 de la impingator pe carcasa de constructie, tunelul elicii. | The block section no. 1 from the pusher lying on the building carcass, the tunnel of the propeller. |
268 | IMAG_259 | 03/02/2006 | Bloc sectia nr. 1 de la impingator pe carcasa de constructie. | The block section no. 1 from the pusher laying on the building carcass. |
267 | IMAG_258 | 03/02/2006 | Bloc sectia nr. 2 de la impingator inainte de montare. | The block section no. 2 from the pusher before the mounting. |
266 | IMAG_257 | 02/24/2006 | Ultimele elemente ale suprastructurii. | The last elements of the upper works. |
267 | IMAG_256 | 02/24/2006 | Bloc sectia nr.2 de la impingator. | The block section no. 2 from the pusher. |
266 | IMAG_255 | 02/24/2006 | Barja vazuta din prova babord. | The barge seen from the port bow. |
265 | IMAG_254 | 02/24/2006 | Impingatorul vazut din pupa babord, asteptind bloc sectia nr.1 si 2. | The pusher seen from the port aft, waiting for the block section no.1 and 2. |
264 | IMAG_253 | 02/24/2006 |
Impingatorul vazut din pupa babord, asteptind bloc sectia nr.1 si 2. |
The pusher seen from the port aft, waiting for the block section no.1 and 2. |
263 | IMAG_252 | 02/24/2006 | Barja vazuta din prova tribord. | The barge seen from the star bow. |
262 | IMAG_251 | 02/24/2006 | Impingatorul vazut din pupa tribord. | The pusher seen from the star aft. |
261 | IMAG_250 | 02/24/2006 | Prova de la impingator. | The bow of the pusher. |
260 | IMAG_249 | 02/24/2006 | Bloc sectiile nr.9, 8,7,6,5 si 4 de la impingator cuplate pe cala de montaj. Vedere din prova tribord. | The bloc sections no.9,8,7,6,5 and 4 from the pusher coupled on the building slip. View from the star bow. |
259 | IMAG_248 | 02/16/2006 | Bloc sectia nr.9 (prova) de la impingator. | The block section no.9 (the bow) from the pusher. |
258 | IMAG_247 | 02/16/2006 | Bloc sectiile 5, 6 si 7 de la impingator cuplate si cu suprastructura montata, jos linga ele se vede extremitatea prova a suprastructurii. |
The bloc sections 5, 6 and 7 from the pusher coupled and with the upper work on, down near them you can see the bow part of the upper work section. |
257 | IMAG_246 | 02/16/2006 | Bloc sectiile 5, 6 si 7 de la impingator cuplate si cu suprastructura montata. | The bloc sections 5, 6 and 7 from the pusher coupled and with the upper work on. |
256 | IMAG_245 | 02/16/2006 | Blocsectia nr.8 de la impingator | The block section no.8 from the pusher. |
255 | IMAG_244 | 02/16/2006 | Prova de la barja asteptind montarea. | The bow section of the barge waiting for mountage. |
254 | IMAG_243 | 02/16/2006 | Barja deja aliniata si cuplata , mai putin sectia prova. Vedere din prova tribord. | The barge already aligned and coupled, less the bow section. View on the star bow. |
253 | IMAG_242 | 02/16/2006 | Barja deja aliniata si cuplata , mai putin sectia prova. Vedere din prova babord. | The barge already aligned and coupled, less the bow section. View on the port bow. |
252 | IMAG_241 | 02/16/2006 | O mica problema la cuplarea bloc sectiilor 1 si 2 de la barja, pe tribord. |
A little problem at the coupling of the block sections 1 and 2 from the barge, on the starboard side. |
251 | IMAG_240 | 02/16/2006 | Bloc sectia nr.3 de la impingator. | The block section no.3 from the pusher. |
250 | IMAG_239 | 02/16/2006 | Bloc sectia nr.4 de la impingator. | The block section no.4 from the pusher. |
249 | IMAG_238 | 02/16/2006 | Extremitatea pupa a suprastructurii impingatorului. | The aft side of the upper works from the pusher. |
248 | IMAG_237 | 02/16/2006 | Ruful prova de la impingator. | The bow roof from the pusher. |
247 | IMAG_236 | 01/30/2006 | Bloc sectia nr.8 de la impingator , vedere din prova. | The block section no.8 from the pusher, view from the bow. |
246 | IMAG_235 | 01/30/2006 | Bloc sectia nr.2 de la impingator , vedere din pupa. | The block section no.2 from the pusher, view from the aft. |
245 | IMAG_234 | 01/30/2006 | Bloc sectia nr.2 de la impingator , vedere din tribord. | The block section no.2 from the pusher, view from the star side. |
244 | IMAG_233 | 01/30/2006 | Suprastructura de la barja. | The upper works of the barge. |
243 | IMAG_232 | 01/30/2006 | Bloc sectia nr.5 de la barja (prova), vedere din babord. | The block section no.5 from the barge (the bow), view from the port side. |
242 | IMAG_231 | 01/30/2006 | Bloc sectia nr.5 de la barja (prova), vedere din pupa. | The block section no.5 from the barge (the bow), view from the aft. |
241 | IMAG_230 | 01/30/2006 | Bloc sectia nr.9 de la impingator (prova). | The block section no.9 from the pusher (the bow). |
240 | IMAG_229 | 01/30/2006 | Sudarea osaturii in interiorul bloc sectiei nr.2 de la impingator. | The welding of the framework inside the block section no.2 from the pusher. |
239 | IMAG_228 | 01/30/2006 | Bloc sectia nr.1 de la impingator in carcasa (pupa), vedere din prova tribord. | The block section no.1 from the pusher in the carcass (the aft), view from the star bow. |
238 | IMAG_227 | 01/30/2006 | Bloc sectia nr.1 de la impingator in carcasa (pupa), vedere din pupa tribord. | The block section no.1 from the pusher in the carcass (the aft), view from the star aft. |
237 | IMAG_226 | 01/30/2006 | Bloc sectia nr.4 de la impingator, vedere din prova tribord. | The block section no.4 from the pusher, view from the star bow. |
236 | IMAG_225 | 01/30/2006 | Bloc sectia nr.3 de la impingator, vedere din pupa. | The block section no.3 from the pusher, view from the aft. |
235 | IMAG_224 | 01/30/2006 | Bloc sectia nr.3 de la impingator, vedere din prova. | The block section no.3 from the pusher, view from the bow. |
234 | IMAG_223 | 01/30/2006 | Bloc sectiile nr.2, 3 si 4 de la barja cuplate pe cala de montaj. Vedere din prova tribord. | The block sections no.2, 3 and 4 from the barge coupled on the berth. View from the star bow. |
233 | IMAG_222 | 01/30/2006 | Vedere din fata a bloc sectiei nr.4 de la barja. Se vede sirma folosita pentru materializarea axei de centrare a bloc sectiilor la cuplare. | The front view of the block section no.4 from the barge. It is seeing the wire used for the materializing of the alignment axe of the block section in the coupling operation on the berth. |
232 | IMAG_221 | 01/30/2006 | Sectie de suprastructura de la impingator. | The upper works section from the pusher. |
231 | IMAG_220 | 01/30/2006 | Bloc sectiile nr.2, 3 si 4 de la barja cuplate pe cala de montaj. Vedere din prova babord. | The block sections no.2, 3 and 4 from the barge coupled on the berth. View from the port bow. |
230 | IMAG_219 | 01/30/2006 | Bloc sectia nr.1(pupa) de la barja gata de asezare pe cala de montaj. | The block section no.1 (the aft) from the barge ready to be put on the berth. |
229 | IMAG_218 | 01/30/2006 | Sectie de suprastructura de la impingator. | The upper works section from the pusher. |
228 | IMAG_217 | 01/30/2006 | Bloc sectiile nr.5, 7 si 6 de la impingator pregatite pentru cuplare pe cala de montaj. | The block sections no.5, 7 and 6 from the pusher prepared for coupling operation on the berth. |
227 | IMAG_216 | 01/12/2006 | Sectia nr.3 de suprastructură de la impingator. | The section of deck erection no.3 from the pusher. |
226 | IMAG_215 | 01/12/2006 | Sectia nr.2 de suprastructură de la impingator. | The section of deck erection no.2 from the pusher. |
225 | IMAG_214 | 01/12/2006 | Sectia nr.1 de suprastructură de la impingator. | The section of deck erection no.1 from the pusher. |
224 | IMAG_213 | 01/12/2006 | Bloc sectia nr.9 de la impingator. | The block section no.9 from the pusher. |
223 | IMAG_212 | 01/12/2006 | Bloc sectia nr.9 de la impingator. | The block section no.9 from the pusher. |
222 | IMAG_211 | 01/12/2006 | Bloc sectia nr.9 de la impingator. | The block section no.9 from the pusher. |
221 | IMAG_210 | 01/12/2006 | Bloc sectia nr.1 de la impingator, vedere din pupa. | The block section no.1 from the pusher, view from the aft. |
220 | IMAG_209 | 01/12/2006 | Bloc sectia nr.1 de la impingator, vedere din prova. | The block section no.1 from the pusher, view from the prow. |
219 | IMAG_208 | 01/12/2006 | Bloc sectiile nr. 6, 7 si 8 de la impingator. | The block section no.6, 7 and 8 from the pusher. |
218 | IMAG_207 | 01/12/2006 | Bloc sectia nr.2 de la impingator. | The block section no.2 from the pusher. |
217 | IMAG_206 | 01/12/2006 | Bloc sectia nr.5 de la impingator. | The block section no.5 from the pusher. |
216 | IMAG_205 | 01/12/2006 | Bloc sectia nr.5 de la barjă. | The block section no.5 fom the barge. |
215 | IMAG_204 | 01/12/2006 | Sectia nr.4 de suprastructură de la impingator. | The section of deck erection no.4 from the pusher. |
214 | IMAG_203 | 01/12/2006 | Sectia de suprastructură de la barjă. | The section of deck erection from the barge. |
213 | IMAG_202 | 01/12/2006 | Bloc sectia nr.4 de la impingator. | The block section no.4 from the pusher. |
212 | IMAG_201 | 01/12/2006 | Bloc sectia nr.4 de la impingator. | The block section no.4 from the pusher. |
211 | IMAG_200 | 01/12/2006 | Bloc sectia nr.3 de la impingator . | The block section no.3 from the pusher. |
210 | IMAG_199 | 01/12/2006 | Bloc sectiile nr.2 si 3 de la barja pregatite pentru cuplare pe cala. | The block sections no.2 and 3 from the barge prepared for coupling on the building slip. |
209 | IMAG 197 | 12/18/2005 | Bloc sectia prova de la barja. | The bow block section from the barge. |
208 | IMAG 196 | 12/18/2005 | Bloc sectia prova de la barja. | The bow block section from the barge. |
207 | IMAG 195 | 12/18/2005 | Partea din pupa a suprastructurii impingatorului. | The aft part of the upper work of the pusher. |
206 | IMAG 194 | 12/18/2005 | Partea din pupa a suprastructurii impingatorului. | The aft part of the upper work of the pusher. |
205 | IMAG 193 | 12/18/2005 | Partea din pupa a suprastructurii impingatorului. | The aft part of the upper work of the pusher. |
204 | IMAG 192 | 12/18/2005 | Puntea de la bloc sectia nr.4 a barjei (jumatatea babord). | The deck from the block section no.4 of the barge (the half star side of the deck). |
203 | IMAG 191 | 12/18/2005 | Puntea de la bloc sectia nr.4 a barjei (jumatatea tribord). | The deck from the block section no.4 of the barge (the half port side of the deck ). |
202 | IMAG 190 | 12/18/2005 | Puntea de la bloc sectia nr.8 a impingatorului. | The deck from the block section no.8 of the pusher. |
201 | IMAG 189 | 12/18/2005 | Bloc sectia nr.5 de la impingator. | The bloc section no.5 from the pusher. |
200 | IMAG 188 | 12/18/2005 | Bloc sectia nr.6 de la impingator. | The bloc section no.6 from the pusher. |
199 | IMAG 187 | 12/18/2005 | Interiorul bloc sectiei nr.1 de la barja (pupa). | The inside of the block section no.1 from the barge (the aft). |
198 | IMAG 186 | 12/18/2005 | Bloc sectia nr.7 de la impingator. | The block section no.8 from the pusher. |
197 | IMAG 185 | 12/18/2005 | Bloc sectia nr.8 de la impingator, inainte de montarea puntii. | The block section no.8 from the pusher, before the deck mounting. |
196 | IMAG 184 | 12/18/2005 | Partea din prova a suprastructurii impingatorului, vedere din pupa. | The fore section of the upper works from the pusher, poop view. |
195 | IMAG 183 | 12/18/2005 | Partea din prova a suprastructurii impingatorului, vedere din pupa. | The fore section of the upper works from the pusher, poop view. |
194 | IMAG 182 | 12/18/2005 | Partea din prova a suprastructurii impingatorului, vedere din prova. | The fore section of the upper works from the pusher, prow view. |
193 | IMAG 181 | 12/18/2005 | Gurna bloc sectiei nr.2 a impingatorului. | The bilge of the block section no.2 from the pusher. |
192 | IMAG 180 | 12/18/2005 | Puntea de la bloc sectia nr.2 a impingatorului. | The deck of the block section no.2 from the pusher. |
191 | IMAG 179 | 12/18/2005 |
Fundul bloc sectiei nr.2 de la impingator, completarea osaturii. |
Completing the framework of the block section no.2 from the pusher. |
190 | IMAG 178 | 12/18/2005 | Fundul bloc sectiei nr.2 de la impingator, completarea osaturii. |
Completing the framework of the block section no.2 from the pusher. |
189 |
12/1/2005 |
Bordurile de la bloc sectia nr.2 a impingatorului. |
The boards from the block section no.2 of the pusher. |
|
188 |
12/1/2005 |
Partea din pupa a suprastructurii impingatorului. |
The aft part of the upper work from the pusher. |
|
187 |
12/1/2005 |
Dublul fund de la bloc sectia nr.2 de la impingator. |
The water bottom of the block section nr. 2 from the pusher. |
|
186 |
12/1/2005 |
Partea din pupa a suprastructurii impingatorului. |
The aft part of the upper work from the pusher. |
|
185 |
12/1/2005 |
Dublul fund de la bloc sectia nr.2 de la impingator. |
The water bottom of the block section nr. 2 from the pusher. |
|
184 |
12/1/2005 |
Vedere generala in ordine, din spate, a bloc sectiilor nr.6 si 5 de la impingator, a bloc sectiei nr.1 de la barja si a bloc sectiilor nr.8 si 7 de la impingator. |
The general view in rear order of the block sections no.6 and 5 from the pusher, of the block section no.1 from the barge and of the block sections no.8 and 7 from the pusher. |
|
183 |
12/1/2005 |
Vedere din pupa a bloc sectiei nr.7 de la impingator. |
The aft view of the block section no.7 from the pusher. |
|
182 |
12/1/2005 |
Bloc sectiile nr.7 si 8 de la impingator inainte de montarea puntilor. |
The block sections no.7 and 8 of the pusher before the mounting of the decks. |
|
181 |
12/1/2005 |
Bloc sectiile nr.7 si 8 de la impingator inainte de montarea puntilor. |
The block sections no.7 and 8 of the pusher before the mounting of the decks. |
|
180 |
12/1/2005 |
Dublul fund si bordurile bloc sectiei nr.4 de la barja, inainte de cuplare. |
The water bottom and the boards of the block section no.4, before the hitching. |
|
179 |
12/1/2005 |
Bloc sectia nr.5 de la barja, se monteaza tablele invelişului. |
The block section no.5 from the barge, there are mounting the plates of the skin. |
|
178 |
12/1/2005 |
Detaliu al carcasei pentru fundul bloc sectiei no.1 de la impingator. |
The detail of the carcass for the bottom of the block section no.1 from the pusher. |
|
177 |
12/1/2005 |
Detaliu al carcasei pentru fundul bloc sectiei no.1 de la impingator. |
The detail of the carcass for the bottom of the block section no.1 from the pusher. |
|
176 |
12/1/2005 |
Vedere din fata a bloc sectiei nr.9 de la impingator. |
The front view of the block section no.9 from the pusher |
|
175 |
12/1/2005 |
Vedere laterala a bloc sectiei nr.9 de la impingator. |
The side view of the block section no.9 from the pusher. |
|
174 |
12/1/2005 |
Partea din pupa a bloc sectiei nr.9 de la impingator. |
The aft part of the block section no.9 from the pusher. |
|
173 |
12/1/2005 |
Tabla superioara a dublului fund al bloc sectiei nr.4 de la impingator. |
The upper plate of the water bottom from the block section no.4 of the pusher. |
|
172 |
12/1/2005 |
Fundul bloc sectiei nr.4 de la impingator. |
The water bottom of the block section no.4 from the pusher. |
|
171 |
12/1/2005 |
Fundul bloc sectiei nr.4 de la impingator. |
The water bottom of the block section no.4 from the pusher. |
|
170 |
12/1/2005 |
Bloc sectia nr.3 de la impingator‚ inainte de montarea bordurilor |
The block section no.3 of the pusher, before the mounting of the boards |
|
169 |
12/1/2005 |
Bloc sectia nr.3 de la impingator‚ inainte de montarea bordurilor. |
The block section no.3 of the pusher, before the mounting of the boards. |
|
168 |
12/1/2005 |
Bloc sectiile nr.2 si 3 de la barja pe cala de montaj. |
The block sections no.2 and 3 of the barge on the berth. |
|
167 |
11/23/2005 |
Tabla dublului fund de la bloc sectia nr.7 de la impingator |
The plate of the water bottom of the block section no.7 from the pusher |
|
166 |
11/23/2005 |
Tabla puntii de la bloc sectia nr.7 de la impingator. |
The deck plate of the block section no.7 from the pusher |
|
165 |
11/23/2005 |
Puntea de la bloc sectia nr.8 a impingatorului. |
The deck of the block section no.8 from the pusher |
|
164 |
11/23/2005 |
Fundul de la bloc sectia nr.2 de la impingator. |
The bottom of the block section no.2 from the pusher |
|
163 |
11/23/2005 |
Panouri de suprastructura de la impingator |
The panels of the upper works from the pusher. |
|
162 |
11/23/2005 |
Panouri de bordaj de la bloc sectiile nr.7 si 8, impingator, inainte de montaj. |
The board panels of the block sections no.7 and 8 from the pusher, before the mounting |
|
161 |
11/23/2005 |
Dublul fund de la impingator, bloc sectia nr.8, montarea peretelui etans. |
The water bottom of the pusher, the block section no.8, mounting of the water tight wall |
|
160 |
11/23/2005 |
Bloc sectia nr.1(pupa) de la barja si în ordine bloc sectiile nr. 6 si 5 de la impingator. |
The block section no.1 from the barge and in order the block sections no.6 and 5 from the pusher. |
|
159 |
11/23/2005 |
Bloc sectia nr. 1 de la barja (pupa). |
The block section no. 1 of the barge ( aft ). |
|
158 |
11/23/2005 |
Interiorul bloc sectiilor nr. 5 si 6 de la impingator. |
The inside of the block section no. 5 and 6 from the pusher. |
|
157 |
11/23/2005 |
Dublul fund si bordurile bloc sectiei nr. 4 de la barja, gata de cuplare. |
The water bottom and the boards of the block section no. 4 from the barge, ready for the coupling operation. |
|
156 |
11/23/2005 |
Bloc sectia nr. 5 de la barja gata pentru invelirea cu tablele cocii |
The block section no. 5 of the barge ready for the skin plates. |
|
155 |
11/23/2005 |
Bloc sectia nr. 5 de la barja gata pentru invelirea cu tablele cocii. |
The block section no. 5 of the barge ready for the skin plates. |
|
154 |
10/27/2005 |
Fundul bloc sectiei nr. 1 de la barja (fundul pupei barjei). |
The bottom of the block section no.1 of the barge (the bottom of the aft part). |
|
153 |
10/27/2005 |
Fundul bloc sectiei nr. 5 si 6 a impingatorului inainte de montarea tablelor dublului fund si a bordurilor. |
The bottom of the block section no. 5 and 6 of the pusher before the mounting of the water bottom plates and the boards. |
|
152 |
10/27/2005 |
Bordurile de la bloc sectia nr. 4 de la barja. |
The boards from the block section no.4 from the barge. |
|
151 |
10/27/2005 |
Bloc sectia nr. 5 de la barja (prova barjei). |
The block section no. 5 from the barge (barge bow). |
|
150 |
10/27/2005 |
Bloc sectia nr. 5 de la barja (prova barjei). |
The block section no. 5 from the barge (barge bow). |
|
149 |
10/27/2005 |
Fundurile bloc sectiilor nr. 7 si 8 de la impingator. |
The bottom of the block sections no. 7 and 8 from the pusher. |
|
148 |
10/27/2005 |
Bordurile de la bloc sectia nr. 4 de la barja. |
The boards from the block section no.4 from the barge. |
|
147 |
10/27/2005 |
Tablele dublului fund pentru bloc sectiile nr. 5 si 6 de la impingator. |
The plates of the water bottom for the block sections no.5 and 6 from the pusher. |
|
146 |
10/27/2005 |
Fundul bloc sectiei nr. 5 si 6 a impingatorului inainte de montarea tablelor dublului fund si a bordurilor. |
The bottom of the block section no. 5 and 6 of the pusher before the mounting of the water bottom plates and the boards. |
|
145 |
10/27/2005 |
Fundul bloc sectiei nr. 5 a impingatorului inainte de montarea bordurilor. |
The bottom of the block section no. 5 of the pusher before the mounting of the boards. |
|
144 |
10/27/2005 |
Perete transversal de la impingator. |
A bulkhead from the pusher. |
|
143 |
10/27/2005 |
Bordajul blocului pupa de la impingator. |
The board side of the aft block from the pusher. |
|
142 |
10/27/2005 |
Bordaje de la impingator. |
The boards from the pusher. |
|
141 |
10/27/2005 |
Unul dintre postamentii motorului de la impingator. |
One of the base slabs of the engine from the pusher. |
|
140 |
10/27/2005 |
Carcasa pentru blocul pupa de la impingator pe care au inceput sa se monteze tablele fundului . |
The carcass for the aft block of the pusher on that they begun to mount the plates of the bottom. |
|
139 |
10/27/2005 |
Carcasa pentru blocul pupa de la impingator pe care au inceput sa se monteze tablele fundului . |
The carcass for the aft block of the pusher on that they begun to mount the plates of the bottom. |
|
138 |
10/27/2005 |
Tabla de osatura cu gusee. |
Frame work plate with gussets. |
|
137 |
10/27/2005 |
Sudarea elementelor de osatura de la impingator. |
The welding of the frame work elements from the pusher. |
|
136 |
10/27/2005 |
Unul dintre postamentii motorului. |
One of the base slabs of the engine. |
|
135 |
10/27/2005 |
Puntea de la bloc sectia nr.5 a impingatorului. Sudarea traverselor. |
The deck of the block section no. 5 of the pusher. The welding of the girders. |
|
134 |
10/18/2005 |
Perete intarit de la impingator. |
Ran forced wall from the pusher. |
|
133 |
10/18/2005 |
Elemente de osatura pentru impingator. |
Elements for framework for the pusher. |
|
132 |
10/18/2005 |
Detaliu pentru decupari. |
The detail for cutting-outs. |
|
131 |
10/18/2005 |
Pereti etansi cu decupari pentru electronituri pregatiti de montaj. |
Water tight walls with cutting-outs for welded rivets prepared for mouting |
|
130 |
10/18/2005 |
Detaliu pentru pupa impingatorului cu forma fundului pe carcasa in zona elicii. |
The detail for the aft of the pusher with the shape of the bottom on the carcass in the area of the propeller. |
|
129 |
10/18/2005 |
Varange sudate pe fundul bloc secţiei nr. 7 de la impingator. |
The floor-plates welded on the water bottom of the block section no. 7 of the pusher. |
|
128 |
10/18/2005 |
Fundul bloc secţiei nr. 7 de la impingator. |
The water bottom of the block section no. 7 of the pusher. |
|
127 |
10/18/2005 |
Carcasa de montaj pentru fundul bloc sectiei nr. 1, pupa, a impingatorului. |
Mounting carcass for the water bottom of the block section no.1, aft part, of the pusher |
|
126 |
10/18/2005 |
Carcasa de montaj pentru fundul bloc sectiei nr. 1, pupa, a impingatorului. |
Mounting carcass for the water bottom of the block section no.1, aft part, of the pusher. |
|
125 |
10/18/2005 |
Fundul bloc sectiei nr. 1, pupa, de la barja. |
The water bottom of the block section no. 1, aft part, of the barge. |
|
124 |
10/18/2005 |
Fundul bloc sectiei nr. 8 de la impingător. |
The water bottom of the block section no. 8 of the pusher. |
|
123 |
10/18/2005 |
Tabla puntii de la bloc sectia nr. 9, impingător, asezata pe carcasa. |
The deck plate of the block section no. 9, pusher, seating on the carcass. |
|
122 |
10/07/2005 |
Fundul bloc secţiei nr. 4 a barjei. |
The bottom of the block section no. 4 of the barge. |
|
121 |
10/07/2005 |
Elemente de osatură pentru bloc secţia nr. 4 a împingătorului. |
The framework elements for the block section no. 4 of the pusher. |
|
120 |
10/07/2005 |
Tabla punţii de la bloc secţia nr. 5 a împingătorului. |
The deck plate of the block section no. 5 of the pusher. |
|
119 |
10/07/2005 |
Fundul bloc secţiei nr. 4 a împingătorului, varange pregătite pentru montaj. |
The bottom of the block section no. 4 of the pusher, floor-plates prepared for montage. |
|
118 |
10/07/2005 |
Fundul bloc secţiei nr. 1 a barjei (pupa), fixarea osaturii (vedere pe babord). |
The bottom of the block section no. 1 of the barge (aft), framework fixing (view from the star side). |
|
117 |
10/07/2005 |
Fundul bloc secţiei nr. 1 a barjei (pupa), fixarea osaturii (vedere pe tribord). |
The bottom of the block section no. 1 of the barge (aft), framework fixing (view from the port side). |
|
116 |
10/07/2005 |
Fundul bloc secţiei nr. 1 a barjei (pupa), fixarea osaturii (vedere pe tribord). |
The bottom of the block section no. 1 of the barge (aft), framework fixing (view from the port side). |
|
115 |
10/07/2005 |
Fundul bloc secţiei nr. 1 a barjei (pupa), fixarea osaturii. |
The bottom of the block section no. 1 of the barge (aft), framework fixing. |
|
114 |
10/07/2005 |
Fundul bloc secţiei nr. 1 a barjei, fixarea osaturii. |
The bottom of the block section no. 1 of the barge, framework fixing. |
|
113 |
10/07/2005 |
Fundul bloc secţiei nr. 5 a împingătorului supusă operaţiunii de îndreptare şi redresare. |
The bottom of the block section no. 5 of the pusher under the operation of redressing and straightening. |
|
112 |
10/07/2005 |
Tabla punţii de la bloc secţia nr. 8 (prova) a împingătorului. |
The deck plate of the block section no. 8 (bow) of the pusher. |
|
111 |
10/07/2005 |
Fundul bloc secţiei nr. 6 a împingătorului supusă operaţiunii de indreptare şi redresare. |
The bottom of the block section no. 6 of the pusher under the operation of redressing and straightening. |
|
110 |
09/26/2005 |
Fundul bloc secţiei 5 de la împingător |
The bottom of the block section 5 of the pusher. |
|
109 |
09/26/2005 |
Vedere din interiorul casetei Kingston. |
View inside the caisson Kingston. |
|
108 |
09/26/2005 |
Chesonul Kingston de la barjă. Decupare tehnologică. |
Caisson Kingston of the barge. Technological hole. |
|
107 |
09/26/2005 |
Vedere din prova a bloc secţiei 3 de la barjă. |
View from prow of the block section 3 of the barje |
|
106 |
09/26/2005 |
Dublul fund al bloc secţiei 2 de la barjă. |
The water bottom of the block section 2 of the barge. |
|
105 |
09/26/2005 |
Gurnele bloc secţiei 4 a împingătorului pregătite pentru montare. |
The bilges of the block section 4 of the pusher prepared for mounting. |
|
104 |
09/26/2005 |
Tabla fundului de la bloc secţia 1 pregătită pentru montarea osaturii. |
The bottom plate of the block section 1 of the barge prepared for frameworks’ mounting. |
|
103 |
09/26/2005 |
Chila cheson de la bloc secţia 6 a împingătorului. |
The duct keel from the block section 6 of the pusher. |
|
102 |
09/26/2005 |
Vedere de sus a fundului de la bloc secţia 6 a împingătorului în timp ce se sudează osatura. |
Up side view of the bottom from the block section 6 of the pusher while the framework is welded. |
|
101 |
09/26/2005 |
Varange sudate pe gurnă la fundul bloc secţiei 8 a împingătorului. |
Floor-plates welded on the bilge to the bottom of the block section 8 of the pusher. |
|
100 |
09/26/2005 |
Vedere din pupa chilei cheson de la bloc secţia 8 a împingătorului. |
Aft view of the duct keel from block section 8 of the pusher. |
|
99 |
09/26/2005 |
Vedere de sus a fundului bloc secţiei 8 a împingătorului cu osatura şi gurnele montate. |
Up side view of the bottom of the block section 8 of the pusher with the framework and bilges mounted. |
|
98 |
09/26/2005 |
Trecerea de la varange de 300mm înălţime la varange de 500mm de la bloc secţia 8 a împingătorului. |
The passing zone from the floor plates of 300mm high to the 500mm high ones in the block section 8 of the pusher. |
|
97 |
09/14/2005 |
Vedere generala a bloc sectiilor 2 şi 3 ale barjei. |
General view of the barge’s block sections 2 and 3. |
|
96 |
09/14/2005 |
Vedere din prova a interiorului dublu bordului tribord a bloc sectiei 2. |
View from the star bow of the inside of the two fold board of the block section 2. |
|
95 |
09/14/2005 |
Vedere din prova a gurnei din tribord a bloc sectiei 2. |
View from the star bow of the bilge brackets of the block section 2. |
|
94 |
09/14/2005 |
Interiorul dinspre prova sectiei 2 a barjei. |
The inside from the fore part of the barge’s block section 2. |
|
93 |
09/14/2005 |
Interiorul dinspre pupa a bloc sectiei 3 a barjei. |
The inside from the aft part of the barge’s block section 3 |
|
92 |
09/14/2005 |
Vedere din prova a bloc sectiei 3 a barjei. |
Fore view of the barge’s block section 3. |
|
91 |
09/14/2005 |
Partea din pupa a bloc sectiei 2 a barjei unde se sudeaza pe verticala peretele etans cu sudura pe suport ceramic. |
Aft part of the barge’s block section 2 where the watertight. It’s welded on vertical with ceramic support. |
|
90 |
09/14/2005 |
Montarea tablei fundului bloc sectiei 5 a impingatorului. |
The mounting of the bottom plate of the pusher’s block section 5. |
|
89 |
09/14/2005 |
Tabla fundului impingatorului de la bloc sectia 8 pregatita pentru montarea osaturii. |
Pusher’s bottom plate of the block section 8 prepared for the mounting of the framework. |
|
88 |
09/14/2005 |
Vedere a fundului bloc sectiei 5 in zona carlingii centrale de tip cheson. |
View of the bottom of the block section 5 in the area of the middle line keelson (duct keel tipe). |
|
87 |
09/14/2005 |
Varange si carlingi pentru bloc sectia 2 a impingatorului. |
Floor plates and keelsons for the block section 2 of the pusher. |
|
86 |
09/14/2005 |
Varange cu inima pregatite pentru sudura. |
Floor plates prepared for welding. |
|
85 |
09/14/2005 |
Elemente de osatura (varange, carlingi) pentru tabla fundului de la bloc sectia 6 a impingatorului. |
Elements of the framework (floor-plates, keelsons) for the bottom plate of the block section 6 of the pusher. |
|
84 |
09/14/2005 |
Elemente de osatura (varange, carlingi) pentru tabla fundului de la bloc sectia 8 a impingatorului. |
Elements of the framework (floor-plates, kelsons) for the bottom plate of the block section 8 of the pusher. |
|
83 |
09/07/2005 |
Fundul bloc sectiei 5 a slepului motor cu varangele pregatite de montaj. |
The bottom of the block section 5 of the motor barge with the floor-plates prepared for montage. |
|
82 |
09/07/2005 |
Vedere generala a blocsectiilor 2 si 3 pe cala de montaj. |
General view of the block section 2 and 3 of the barge on the berth. |
|
81 |
09/07/2005 |
Vedere de sus a blocsectiilor 2 si 3 |
Upper view of the block section 2 and 3 of the barge. |
|
80 |
09/07/2005 |
Vedere de sus a bloc sectiei 2 cu puntea montata. |
Upper view of the block section 2 with deck mounted. |
|
79 |
09/07/2005 |
Vedere de sus a bloc sectiei 3, langa ea este pregatita puntea pentru montare. |
Upper view of the block section 3, near it is prepared for mounting the deck. |
|
78 |
09/07/2005 |
Vedere din pupa a bloc sectiei 2. |
View from aft part of the block section 2 |
|
77 |
09/07/2005 |
Vedere din prova a interiorului bloc sectiei 2 cu partea din pupa tancului de marfa al barjei. |
View from the fore part of the inside of the block section 2 with the barge’s cargo tank. |
|
76 |
09/07/2005 |
Vedere din tribord a bloc sectiei 3 a barjei, cu peretele transversal etansmontat, inainte de cuplarea dublului bord |
View from the portside of the block section 3 of the barge, with the mounted transversal bulkhead, before the coupling of the twofold board. |
|
75 |
09/07/2005 |
Varange sudate pe tabla fundului blocsectiei 5. |
Welded floor-plates on the plate of the bottom of the block section 5. |
|
74 |
09/07/2005 |
Elemente de osatura de la bloc sectia 8 a slepului motor. |
The framework’s elements from the block section 8 of motor barge. |
|
73 |
09/07/2005 |
Elemente de osatura de la bloc sectia 8 a slepului motor. |
The framework’s elements from the block section 8 of motor barge. |
|
72 |
08/30/2005 |
Vedere generala a bordajului tribord sectia 2 de la barja. |
General view, the grinding of the welding of the portside board of the barge’s block section 2. |
|
71 |
08/30/2005 |
Polizarea sudurilor chesonului Kingstone. |
The grinding of the welding from the Kingston’s caisson. |
|
70 |
08/30/2005 |
Vedere generala a bordajului tribord inainte de montarea in bloc sectia 2 a barjei. |
General view of the portside board before the assembly in the barge‘s block section 2. |
|
69 |
08/30/2005 |
Polizarea bordajului tribord de la bloc sectia 2 în zona chesonului Kingstone. |
The grinding of Kingston’s caisson in the port sideboard of the block section 2. |
|
68 |
08/30/2005 |
Patul de montaj al bloc sectiilor 2 si 3 de la barja. |
Assembling layer for the block sections 2 and 3 of the barge. |
|
67 |
08/30/2005 |
Bordurile de la bloc sectiile 2 si 3 pregatite de montaj pe dublul fund. |
The sideboards of the block sections 2 and 3 prepared of assembling on the water bottom. |
|
66 |
08/30/2005 |
Table taiate pentru slepul motor sunt aduse in hala de montaj. |
The cutted out plates prepared for motor barge are brought in the assembling room. |
|
65 |
08/30/2005 |
Profile bulb pentru restul de bloc sectii de la barja. |
The bulb profiles for the framework of the rest block sections for the barge. |
|
64 |
08/30/2005 |
Puntea de la bloc sectia 2 finalizata. |
The deck of the block section number two finished. |
|
63 |
08/30/2005 |
Elemente de osatura pentru barja. |
Work frames’ elements for the other block sections of the barge |
|
62 |
08/23/2005 |
Ultimele suduri la structura dublului bord. |
The last welding to the framework of a tow fold board |
|
61 |
08/23/2005 |
Osatura capatului unui dublu bord. |
The frame works at the end of a two-fold board. |
|
60 |
08/23/2005 |
Fixarea ultimelor gusee pe puntea bloc sectiei nr.2. |
Mounting of the last gussets on the framework of the cell no 2. deck . |
|
59 |
08/23/2005 |
Puntea bloc sectiei nr. 3 terminata. |
The deck of the block section no. 3 finished. |
|
58 |
08/23/2005 |
Peretele etans al compartimentului pupa, doua elemente de bordaj si puntea de la bloc sectia nr.3. Ultimele finisari. |
The bulkhead of the aft room, two elements of boards and the deck for the block section no.3. |
|
57 |
08/23/2005 |
Puntea pentru bloc sectia nr.2. |
The deck of the block section no.2. |
|
56 |
08/23/2005 |
Tablele pregatite pentru debitare. |
The plates prepared for cutting out. |
|
55 |
08/23/2005 |
Debitarea tablelor pentru bloc sectiile urmatoare. |
The cutting out of the plates for the next block sections. |
|
54 |
08/23/2005 |
Unul dintre dublu bordurile bloc sectiei nr.3 adus pe pozitie. |
One of the two-fold boards for the block section no.3 prepared for coupling. |
|
53 |
08/23/2005 |
Dublu fund din bloc sectia nr. 3 pregatit pentru cuplarea cu bordurile si puntea. |
Water bottom of block section no.3 prepared for coupling with the board sides and the deck. |
|
52 |
08/23/2005 |
Dublu fund din bloc sectia nr.2 pregatit pentru cuplarea cu bordurile si puntea. |
Water bottom of block section no.2 prepared for coupling with the board sides and the deck |
|
51 |
08/16/2005 |
Bloc sectia dublului fund numarul doi finalizata. |
Water bottom’s cell number 2 finished. |
|
50 |
08/16/2005 |
Vedere in interiorul unei bloc sectii de bordaj dupa fixarea tablei gurnei. |
View inside of board cell after the mounting of bilge plate. |
|
49 |
08/16/2005 |
Trecerea de la carlinga centrala a dublului fund la chila. |
Passing from middle line keelson of the water bottom to the bilge keelson. |
|
48 |
08/16/2005 |
Guseu pentru rigidizarea peretelui etans. |
Gusset plate of the bulkhead. |
|
47 |
08/16/2005 |
Partea din pupa a bloc sectiei de dublu fund numarul 2 in zona peretelui etans. |
Aft part of the water bottom from the block section 2 in the area of the bulkhead. |
|
46 |
08/16/2005 |
Fixarea stringherilor de bordaj. |
Fixing of the board’s stringers. |
|
45 |
08/16/2005 |
Structura de dublu bord cu osatura finalizata. |
Structure of twofold board with the framework finished. |
|
44 |
08/16/2005 |
Bloc sectia dublului bord. Centrarea coastei si fixarea stringherilor in vederea sudarii. |
Twofold board’s block section. Web frame centering and stringers fixing before the welding. |
|
43 |
08/16/2005 |
Montarea stringherilor de bordaj in bloc sectia dublului bord. In prim plan se vad tablele puntii de la bloc sectia 3. |
The building of stringers in the board section. In the first plan you see the deck plates of block section three. |
|
42 |
08/09/2005 |
Tablele puntii pentru cea de a treia bloc sectie. |
Deck plate for the third section |
|
41 |
08/09/2005 |
Vedere generala cu bordaje si dublu fund. |
General view with boards and water bottom |
|
40 |
08/09/2005 |
Osatura pe tablele dublului fund a celei de a treia bloc sectii. |
The frame work on the plate of the water bottom of third section. |
|
39 |
08/09/2005 |
Decupare pentru caseta Kingston pe fundul bloc sectiei 2. |
The cutout for Kingstone caisson on the bottom of engine room. |
|
38 |
08/09/2005 |
Interiorul sectiei dublu bord. |
Inside of the two fold board section. |
|
37 |
08/09/2005 |
Coaste intărite pentru sectia de bord. |
Web frames for the board section. |
|
36 |
08/09/2005 |
Acelasi dublu fund. |
Other angle of view for the water bottom of second section. |
|
35 |
08/09/2005 |
Vedere din alt unghi a dublului fund al bloc sectiei trei. |
Other angle of view for the water bottom of second section. |
|
34 |
08/09/2005 |
Bordajul celei de a doua blocsectii. |
One of the second section board. |
|
33 |
08/09/2005 |
Dublu fund al blocsectiei numarul trei este terminat. |
The water bottom of the third section is finished. |
|
32 |
08/09/2005 |
Fundul bloc sectiei numarul doi inainte de sudarea tablelor dublului fund. |
The bottom of the water bottom before to be covered with the upper plates. |
|
31 |
08/09/2005 |
Dublu bordaj pentru bloc sectia a doua. |
Twofold boards from the second ship’s body section. |
|
30 |
08/01/2005 |
Sudarea unuia dintre profilele transversale. |
Welding one of the cross beam |
|
29 |
08/01/2005 |
Alte doua table ale puntii. |
Other two plates of the board. |
|
28 |
08/01/2005 |
Tabla puntii din sectia a treia. |
Deck plate from the third section. |
|
27 |
08/01/2005 |
Table laterale din sectia a doua si tabla puntii apartinand aceleasi sectii. |
Side tables from the second section and the deck plate from the same section. |
|
26 |
08/01/2005 |
Doua coaste intarite pregatite pentru montarea in structura bordajului. |
Two web frame prepared to be built in the board structure. |
|
25 |
08/01/2005 |
Aceiasi vedere din alt unghi. In prim plan se vad profilele cu bulb pentru osatura si doua table din invelisiul bordajului. |
The same from another angle. In the first plane you see the bulb profiles for the framework and two plates of the side skim. |
|
24 |
08/01/2005 |
Dublu fund din bloc sectia 3. Varangele si longitudinalele sunt sudate si se pregateste fixarea gurnei. In primul plan se poate vedea o parte din tablele puntii sectiei 3. |
The water bottom of the third ship’s body section. Floor plates and longitudinal are already welded and prepare to fix the bilge. In the first plane of the photo you can see a piece of the deck plate |
|
23 |
08/01/2005 |
Dublu fund din bloc sectia 2, in timpul sudarii. |
The same, you see only the welding. |
|
22 |
08/01/2005 |
Dublu fund din bloc sectia 2. Sudura varangelor cu inima inainte de asiezarea tablei dublului fund. |
There is the water bottom of the second ship’s body section. Floor plaits welding, before covering with bottom board. |
|
21 |
07/24/2005 |
Pregatirea patului de montaj pentru inceperea executiei elementelor blocsectiilor (borduri si dublu fund) |
The set up of the assembling layout in order to get started the manufacturing of the block sections elements (sides and double floor) |
|
20 |
07/24/2005 |
Pregatirea patului de montaj pentru inceperea executiei elementelor blocsectiilor (borduri si dublu fund) |
The set up of the assembling layout in order to get started the manufacturing of the block sections elements (sides and double floor) |
|
19 |
07/24/2005 |
Pregatirea patului de montaj pentru inceperea executiei elementelor blocsectiilor (borduri si dublu fund) |
The set up of the assembling layout in order to get started the manufacturing of the block sections elements (sides and double floor) |
|
18 |
07/24/2005 |
Pregatirea patului de montaj pentru inceperea executiei elementelor blocsectiilor (borduri si dublu fund) |
The set up of the assembling layout in order to get started the manufacturing of the block sections elements (sides and double floor) |
|
17 |
07/24/2005 |
Pregatirea patului de montaj pentru inceperea executiei elementelor blocsectiilor (borduri si dublu fund) |
The set up of the assembling layout in order to get started the manufacturing of the block sections elements (sides and double floor) |
|
16 |
07/24/2005 |
Pregatirea patului de montaj pentru inceperea executiei elementelor blocsectiilor (borduri si dublu fund) |
The set up of the assembling layout in order to get started the manufacturing of the block sections elements (sides and double floor) |
|
15 |
07/24/2005 |
Asezarea formatelor de tabla pentru fundul navei si pregatirea (pozitionarea) lor in vederea sudarii semiautomate |
The positioning of the sheet layouts for the ship bottom for the assembling operation in order to be semi automatically welded |
|
14 |
07/24/2005 |
Asezarea formatelor de tabla pentru fundul navei si pregatirea (pozitionarea) lor in vederea sudarii semiautomate |
The positioning of the sheet layouts for the ship bottom for the assembling operation in order to be semi automatically welded |
|
13 |
07/24/2005 |
Elemente de osatura pentru debitare |
Structural elements ready for the cutting operation |
|
12 |
07/24/2005 |
Elemente de osatura pentru debitare |
Structural elements ready for the cutting operation |
|
11 |
07/24/2005 |
Elemente de osatura pentru debitare |
Structural elements ready for the cutting operation |
|
10 |
07/24/2005 |
Formate de tabla pentru executarea fundului navei |
Sheet layouts for the ship bottom manufacturing |
|
9 |
07/24/2005 |
Debitare tabla pe masina de debitare digitala cu plasma |
Sheet cutting on the plasma cutting machine |
|
8 |
07/24/2005 |
Debitare tabla pe masina de debitare digitala cu plasma |
Sheet cutting on the plasma cutting machine |
|
7 |
07/24/2005 |
Debitare tabla pe masina de debitare digitala cu plasma |
Sheet cutting on the plasma cutting machine |
|
6 |
07/24/2005 |
Debitare tabla pe masina de debitare digitala cu plasma |
Sheet cutting on the plasma cutting machine |
|
5 |
07/24/2005 |
Debitare tabla pe masina de debitare digitala cu plasma |
Sheet cutting on the plasma cutting machine |
|
4 |
07/24/2005 |
Debitare tabla pe masina de debitare digitala cu plasma |
Sheet cutting on the digital plasma cutting machine |
|
3 |
07/24/2005 |
Pachet cu table pentru debitare |
Sheet package for the cutting operation |
|
2 |
07/24/2005 |
Asezare tabla pe masina de debitat cu plasma |
Sheet positioning on the plasma cutting machine |
|
1 |
07/24/2005 |
Asezare tabla pe masina de debitat cu plasma |
Sheet positioning on the plasma cutting machine |